SUNGARD
Location: Carstadt
Completion Date: June, 2017
GC: M.F. Malone
Description: Redundant primary and secondary chilled water system for critical 24/7 data center. AMC provided new chilled water loop connecting into existing chillers in order to have a redundant piping system in case of failure with the existing pipe. System needed to run on temporary pumps for a period of time while the switchover occurred. We added roughly 4,500 gallons of volume to the glycol system and thousands of feet of pipe.
mechanical contractor, nj HVACR, nj HVAC, nj commercial HVAC, Advanced Mechanical, AMC,